A form of welding filler metal, normally packaged in straight lengths, that does not conduct the welding current.

The order in which weld beads are deposited in a weldment.

The localized volume of molten metal in a weld prior to its solidification as weld metal.

A non-standard term for weld pool.

Weld metal in excess of the quantity required to fill a joint.